Maintenance Window for two Mix Servers

The data center where the two mix servers "FreeBeer" and "Goose" (both operated by L. Pimenidis) are hosted will be migrating to a new place, hence the two mix servers are scheduled to be transferred either June 27th 6am CEST or June 28th 6 am CEST. The free mix cascade "FreeBeer-Bolzano" and the premium mix cascade "Locke-Goose-Pluto" will be down for this time.

We're sorry for any inconvenience.

Trackbacks

    No Trackbacks

Comments

Display comments as (Linear | Threaded)

    No comments


The author does not allow comments to this entry